Rules and regulations


Harriman Utility Board Fees



Download 101.5 Kb.
Page15/20
Date29.06.2021
Size101.5 Kb.
#147435
1   ...   12   13   14   15   16   17   18   19   20

Harriman Utility Board Fees


Residential new service connection: $25.00


Electric Meter test fee: $25.00
Returned check fee: $25.00
Reconnection fee: $25.00
Trip charge: $25.00
2nd Trip charge: $50.00
Meter tampering: $250 plus material and labor
Security light installation fee: $25.00
High Risk Deposits: $150.00 for electric, $150.00 for gas, and $75.00 for water

High Risk Deposits are charged when a customer is disconnected for nonpayment for the second time in a 12 month period.


High Risk Fee: $50.00

High Risk Fee’s are charged each time a customer is disconnected after they already have paid the high risk deposit. This $50.00 fee is non refundable.




Download 101.5 Kb.

Share with your friends:
1   ...   12   13   14   15   16   17   18   19   20




The database is protected by copyright ©essaydocs.org 2023
send message

    Main page