II. 1 Introduction



Download 363.5 Kb.
Page14/26
Date25.02.2021
Size363.5 Kb.
1   ...   10   11   12   13   14   15   16   17   ...   26
Pavilion IV

Date(s) of Work: c. 1984, 1992 & 1997

Pavilion IV has not yet received major attention under the comprehensive Academical Village restoration program. In 1984 and 1992, it did receive some interior remodeling. The work of 1997 was reconstruction of the front balcony.
The formal series of historic structure reports did not begin until 1987.

CHAPTER 5


Pavilion V

Date(s) of Work: c. 1993-4, 1997, 1999 & 2002

Pavilion V was the fifth pavilion to receive major attention under the comprehensive Academical Village restoration program. Work conducted in 1993-4 constituted essentially complete renovation of the entire building, with only a few issues deferred to future revisits, probably coinciding with occupancy changes. The work of 1997 was reconstruction of the front balcony. Occupancy changes in 1999 and 2002 occasioned minor repairs but few alterations.
Pavilion V was the fourth pavilion for which a formal historic structure report was prepared.

CHAPTER 6





Share with your friends:
1   ...   10   11   12   13   14   15   16   17   ...   26




The database is protected by copyright ©essaydocs.org 2020
send message

    Main page