Green power providers participation agreement


PARTICIPANT AND QUALIFYING SYSTEM INFORMATION



Download 98.34 Kb.
Page17/21
Date29.06.2021
Size98.34 Kb.
1   ...   13   14   15   16   17   18   19   20   21
PARTICIPANT AND QUALIFYING SYSTEM INFORMATION
15.1 Participant’s and Qualifying System’s Type Information (This information must be fully completed by the Participant.)


  • The Qualifying System shall be located at the following Address*:

     

City:      State:     

Zip Code:      


  • Participant Electric Service Account Number:      








Solar Photovoltaic (PV) Wind ** Low-Impact Hydro Biomass

If Biomass, please specify the fuel type:      




  • Total Nameplate Capacity of Qualifying System:       kW DC (kW AC for biomass or synchronous generators)

* Note: the Address must match the local power company’s billing system physical address.

** Hydro generation must be located in the Cumberland River watershed or in the Mississippi River, and the Participant must provide documentation that it meets any applicable requirements of the Federal Energy Regulatory Commission (FERC). Hydro generation could be located in the Tennessee River watershed only if TVA were to issue a Section 26a permit.





Share with your friends:
1   ...   13   14   15   16   17   18   19   20   21




The database is protected by copyright ©essaydocs.org 2020
send message

    Main page