Department of the Environment, Water, Heritage and the Arts Waste Technology and Innovation Study


Site area required for 40,000 – 50,000 t/yr facility



Download 2.71 Mb.
Page65/129
Date28.01.2021
Size2.71 Mb.
1   ...   61   62   63   64   65   66   67   68   ...   129
Site area required for 40,000 – 50,000 t/yr facility

Approx 5.6 ha for the Eastern Creek site in Sydney

Approx 2 ha for Port Macquarie (estimated as no published information available).

Approx 2 ha for Pt Stephens plant (estimated as no published information available).

Approx 1.1 ha for buildings plus operational areas for Coffs Harbour plant. Total area of 3.5ha reportedly required for Coffs Harbour RRC.




Produces

Stable organic products such as organic growth media – compost or average daily cover. Also produces recyclables and/or inert material.

High quality compost from source separated organics and landfill cover from mixed waste.

Low grade compost.

Lower grade compost.

Energy and soil conditioner

Diversion Rate

About 70%

Not reported

Not reported

Organics fraction, 96%, mixed waste 80% - 85%.







Share with your friends:
1   ...   61   62   63   64   65   66   67   68   ...   129




The database is protected by copyright ©essaydocs.org 2020
send message

    Main page