Computer Design cpe 432 Homework 1 1 Chip Fabrication Cost


Idle time = 1.0 – 0.70 = 0.30



Download 52 Kb.
Page4/7
Date18.01.2021
Size52 Kb.
#99903
1   2   3   4   5   6   7
Idle time = 1.0 – 0.70 = 0.30

3) The Cost of Reliability (and Failure) in Web Servers

Exercises 3 and 4 deal with the cost of not having reliable Web servers. The data is in two sets: one gives various statistics for Gap.com, which was down for maintenance for two weeks in 2005 [AP 2005]. The other is for Amazon.com, which was not down, but has better statistics on high-load sales days. The exercises combine the two data sets and require estimating the economic cost to the shutdown.


The main reliability measure is MTTF. We will now look at different systems and how design decisions affect their reliability. Refer to Figure 1.25 for company statistics.

  1. We have a single processor with an FIT of 200. What is the MTTF for this system?


Download 52 Kb.

Share with your friends:
1   2   3   4   5   6   7




The database is protected by copyright ©essaydocs.org 2023
send message

    Main page