Chapter 1 Department of Transportation Administration Act


-1-216 Statewide electric vehicle charging network plan -- Report



Download 239.21 Kb.
Page18/23
Date29.01.2021
Size239.21 Kb.
1   ...   15   16   17   18   19   20   21   22   23
72-1-216 Statewide electric vehicle charging network plan -- Report.

(1)

(a) The department, in consultation with relevant entities in the private sector, shall develop a statewide electric vehicle charging network plan.

(b) To develop the statewide electric vehicle charging network plan, the department shall consult with political subdivisions and other relevant state agencies, divisions, and entities, including:

(i) the Department of Environmental Quality created in Section 19-1-104;

(ii) the Division of Facilities Construction and Management created in Section 63A-5b-301;

(iii) the Office of Energy Development created in Section 63M-4-401; and

(iv) the Department of Natural Resources created in Section 79-2-201.

(2) The statewide electric vehicle charging network plan shall provide implementation strategies to ensure that electric vehicle charging stations are available:

(a) at strategic locations as determined by the department by June 30, 2021;

(b) at incremental distances no greater than every 50 miles along the state’s interstate highway system by December 31, 2025; and

(c) along other major highways within the state as the department finds appropriate.

(3) The department shall provide a report before November 30, 2020 to the Transportation Interim Committee to outline the statewide electric vehicle charging network plan.


Enacted by Chapter 104, 2020 General Session



Share with your friends:
1   ...   15   16   17   18   19   20   21   22   23




The database is protected by copyright ©essaydocs.org 2020
send message

    Main page